Town Hall and Post Office, Montigny (18)

Restructuring, transformation
Cover image of the project Town Hall and Post Office

This is a story built by many hands, not just a town hall, a post office and a square. It is the bond formed with people who love their "land". It is drawing a detail around a table and seeing the change happen in the eyes of the craftsperson and the client team. It is the agreement and understanding of a shared process: revealing a small piece of territory.

From three existing buildings – a former bakery, a bistro and a barn – the challenge was to create a friendly meeting place for all the residents of Montigny, a festival square and a path for children walking to school. A work of analysing the "building layers" piled up and added over the years. A work of removing elements to return to the original clean lines. A work, too, of salvaging the removed materials to reuse them in new and sometimes unexpected ways – in the end, a joy of building.

Location

Montigny, 18

Client

Municipality of Montigny (Client)
Cher Ingénierie des Territoires (Delegated client)

Completion

2019

Area

Floor area: 210 m²

Construction cost

€375,000 excl. VAT

Team

Fabienne Bulle architecte & associés (Lead architect), SIBAT (Structural and MEP engineering, cost consultant)

Documentation

Resources

The village of Montigny,

Its urban structure analysed by the students of the Fabrique collective (Master's programme at the École Spéciale d'Architecture)

The Fabrique collective workshop

Set up in Montigny

To better understand the environmental and social context

Projects exhibited at the Town Hall

To capture residents' attention and start a valuable dialogue with them

To gather their critical or supportive comments

To arrive at a project fully suited to their needs

Tools

Drawings

Construction site