Police Station, Kremlin-Bicêtre (94)

Competition, demolition, reconstruction
Cover image of the project Police Station

This project involves restructuring the Kremlin-Bicêtre police station, a central district station covering five towns in the Val-de-Marne. As it stands, the station suffers from real technical and functional problems. To solve them, the first decision was to demolish the existing building, unsuited to current operations, and to rebuild a high-performance work tool from scratch, taking into account changes in departments, staff numbers,

activities and methods.

Driven by the strong urban and landscape ambitions of its elected officials, the new Kremlin-Bicêtre police station adopts a bold contemporary architectural approach that sets the facility within a changing site, allowing it both to stand out in the city and to protect itself from views and projectiles from the future buildings around it – creating a building that is both solid and functional, while offering a new landscape poetry between the town centre and the Bièvre valley.

Location

Kremlin-Bicêtre, 94

Client

Paris Police Prefecture

Competition

2019

Area

GFA: 2,433 m²

Construction cost

€10,000,000 excl. VAT

Team

Fabienne Bulle architecte & associés (Lead architect), QUADRIPLUS (Multidisciplinary engineering, Cost consultant)